PesWiki.com

Menu

Blog:GAIA's AuKW Demo

Lasted edited by Andrew Munsey, updated on June 14, 2016 at 9:00 pm.

  • 8 errors has been found on this page. Administrator will correct this soon.
  • This page has been imported from the old peswiki website. This message will be removed once updated.
Image:Top5small.png
Presently in the Top 5 Exotic Free Energy Technologies due to its arrival in the market, though it's a bit on the pricey side.
Image:150502b labeled 800.jpg
Image:250415-rosch-gaia-aukw-besichtigung02 350.gif

Last updated There was an error working with the wiki: Code[1], There was an error working with the wiki: Code[2] There was an error working with the wiki: Code[3], There was an error working with the wiki: Code[4] There was an error working with the wiki: Code[5] GMT

(The most active updating is likely to be 13-20 GMT, after Sterling is awake in Utah to catch up with what has happened in Germany)

: Shortcut url: http://tinyurl.com/AuKWDemo

GO (hotlink below): Blog:GAIA's AuKW Demo

Next: Blog:Rosch's 15 kW and 100 kW Demo (private) - starting ~ June 16

Sterling's Radar: Scale : Fraud < 0 . 1 . 2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 10 > Real

:My Score 10

: Updated June 30, 2015

:http://pesn.com/2015/06/20/9602633_Why-Im-100-percent-sure_Roschs-KPP-Free-Energy-Technology_Works/

What: Inasmuch as there is so much activity presently for the 5 kW Directory:Thrust Kinetic Generator by Rosch Innovations AG KPP (kinetic power plant) demonstration by Directory:Gaia-Energy -- Global Association for Independent Energy & Altruism, I've decided to launch this page here at PESWiki to feature the latest developments (after this intro section). -- Congress:Founder:Sterling D. Allan (launched April 26, 2015 0:15 GMT)

: May 13 Note: The cumulative power before, during, and after the demo came to 1954 kW-h, which, over 18 days (starting April 18, a week before the April 25 public demo began), comes to 108.6 kW-h/day, or 4.5 kW-h/h.

Claim: The production prototype, first of 500, is self-sustaining (no input power), with 4.8 kW net output.

Date, Location

: from April 25 until May 6

: Brüssler Strasse 15, 53841 Troisdorf (next to Cologne airport), Germany

AuKW: Auftriebskraftwerk = lift power plant

Submit : PESWiki is publicly editable, so you can help keep this updated. If you don't have an account, write to [mailto:StuartCampbell@pesn.com?subject=PESWiki%20user%20set-up%20request Stuart], letting him know what username you want to use. If you prefer to just relay something for us to post, email it to news {at} pesn.com.

Key Links

Germane to the demo...

http://www.gaia-energy.org (English) - Official blog

http://gaia-energy.org/live-stream/ YouTube

Project AuKW (English) - specs, price

http://www.gaia-energy.org/powerforever - about this demo, with dates, times, sign-up

http://gaia-energy.org/es-ist-soweit-mach-dich-energieautark/ (translate to English) - their page about the AUKW

YouTube playlist

http://www.rosch.ag - Parent company

PESWiki: Directory:Thrust Kinetic Generator by Rosch Innovations AG | Directory:Gaia-Energy -- Global Association for Independent Energy & Altruism | News:Buoyancy

PESN Key Stories: GAIA demonstrating 5 kW taking orders | 100 MW Rosch systems in operation | My reasons for believing

Overunity.de: Topic: Rosh buoyant power plant Gaia buoyancy-power plant - how does it work? (largely skeptical) Overunity.com latest

Load

(The generator capacity is said to be 7 kW)

In J.D.'s video of his visit of the demo on May 1st, Mr. Beiser (Technical Head of GAIA) explains the load @8:40 as follows:

Here is what the load entails:

:4 spotlights with 400 W each = 1600 W

:2 infrared heaters with 1200 W each = 2400 W

:3 sodium vapor lamps with 250 W each = 750 W

:1 TV with 80 W

:———————

:That gives a total load of 4830 W

Plus the power requirement of:

:Air Pump = 150 W

:Panels/Electronics/Circuitry = ? W

probably The Airpump 150 | PDF Service Manual - Drawing ~100 to 120 Watts. It works up to a depth of 5.5 meters.

similar: Alita 250-500 W | Airtech150

-- SilverThunder 19:52, 2 May 2015 (UTC)

Blog

GAIA AuKW - New Installations Receptive to Visitations By Potential Buyers

Story written by Stuart Campbell 28Aug2015.

GAIA themselves are not planning any visitations for people to look at and inspect the 5kW AuKW unit.

Instead existing buyers/installations have offered to allow future potential buyers to look at their setup. Right now these current installations and locations are being with-held for privacy reasons. There will be hundreds of people interested in this process, so it makes absolute sense to allow the installation to be completed without being side-tracked during the process.

When they do become available, which, as I said, will only be after the installation is complete and in full operation, you will then be able to go and see them.

As a matter of courtesy, you will of course need to make an appointment with the user/installer to inspect and discuss their setup.

I see this as being a first class way of helping potential buyers in making a decision.

No salesman to encounter, just someone who is actually using the unit in a real life situation. And who could give you some tips/advice from their experience/s.

Sam Mac who contacted GAIA received this reply email from GAIA.

Email in German language:

:vielen Dank für Deine Nachricht!

:Derzeit sind keine weiteren Besichtigungen zur 5KW-Anlage geplant.

:Es gibt jedoch bereits Besteller welche sich jetzt schon bereit erklären, Ihre Anlage für

:Interessierte an deren Standort zugänglich zu machen.

:Wir wir das gemeinschaftlich umsetzen wird noch erarbeitet, derzeit geben wir aus datenschutzrechtlichen Gründen noch keine

:Adressdaten weiter.

:liebe Grüße vom GAIA Infoteam

Slight editing on translation/s for clarity) :

GOOGLE translation:

:Thank you for your message!

:No further visits to 5KW system are planned.

:However, there are already ordering explaining now already prepared your system for

:To make people interested in their location accessible.

:We will implement the jointly developed yet to come, currently we give none for privacy reasons no Address details further.

:Greetings from GAIA Infoteam

BING translation :

:Thank you for your message!

:No further visits to the 5KW-Anlage are currently planned.

:But already there are buyer/s which now already willing, to make their site accessible to you.

:We the community will implement is still being worked out, currently we give not for privacy reasons

:Address next.

:Greetings from GAIA Infoteam

--DJSTU 22:05, 27 August 2015 (UTC)

GAIA Solves AuKW Air Valve Problem Generator Arrives and is Attached

Story written by Stuart Campbell 21Aug2015.

Here's the latest posting on the GAIA website.

Photo showing GAIA team performing an inspection on the AuKW.

:
Image:AuKW Assembly 17Aug2015.jpg

Translation:

[Slight editing for clarity purposes]

August 17, 2015

Project AuKW - Update KW 34/2015

By: Christoph Beiser

Header: In recent days, Extensive Work Performed on The AuKW.

Two translations since each gives a different angle...

GOOGLE translation:

:Primarily, a meticulous inspection of each container and the valve guide was performed, resulting in some repair work.

:Further solutions for a problem-free, continuous operation were drafted. The tightness and function of the air intakes is now back to 100%.

:This has been inspected and tested in a specially constructed pool view.

:In the meantime, the generator has arrived and is attached to the transmission and put into operation.

:This configuration is necessary because the power plant is to be tested in further consequence by the state government and certified as Ökostomanlage. The certification is a prerequisite for feed-in (to the grid) and for the entry into the energy performance certificate.

:With respect to the preparation of production the blueprints provided will be digitized and optimized.

:We stay on the ball.

MICROSOFT translation:

:First and foremost, carried out a meticulous inspection of each tank and the valve Guide and resulting repair work done.

:Further approaches were elaborated for a trouble-free continuous operation. The sealing and the function of the air intakes is now back to 100%. That was in a specially constructed perspective pool controlled and audited.

:In the meantime the generator has arrived and is attached to the gear unit and put into operation. This design is necessary because the plant subsequently by the provincial government to be tested and certified as Ökostomanlage. The certification is a prerequisite for a dining arrangements and for the registration in the energy performance certificate.

:In relation to the preparation of the production, the blueprints provided are digitized and optimized.

:We stay on the ball.

-- DJSTU 22:09, 20 August 2015 (UTC)

Gaia Workshop Start Producing AuKW

Story written by Stuart Campbell 07Aug2015.

Here's the latest posting on the Gaia website showing the arrival of their latest baby, a further AuKW.

This is GAIA's Receiving of Serial Sample No 2.

:
Image:Gaia Workshop No 4 07Aug2015.jpg

Take a look at the right hand-side of the photo, then to the right hand-side of the forklift.

You will see a blue glass square shaped tall tube. Could this be the construction of their next see through demonstration unit ?

Translation for photo and video:

: After his safe travel the recurrence pattern has now been unloaded - here a few moments to view.

: We would like to thank the hard working helpers, which transports the sample last week across the country and have now also unloaded safely.

: Now we go to the next steps.

And in this regard, following the receipt of Serial Sample No 2, they said earlier on the 16th July, 2015, that this would happen (edited and translated):

: Based on us from the available series pattern from Spich we will as soon as possible to create an optimized production patterns. Following the successful testing and commissioning, we carry out the order of the key components. From this point, we expect a delivery time of max. 8 weeks for the components.

So I take that to mean that eight weeks from when the testing and commissioning of Series 2 has been completed, that they plan to have all the components ready for assembly for the very first Workshops they will be running.

They have also produced a short video showing the new arrival.

NZxmXtXpTMM

(YouTube / PES Network August 6)

--DJSTU 03:11, 7 August 2015 (UTC)

FOR SALE: GAIA's 5 kW AuKW Home Power Generator
Image:GAIA-AuKW 5kW-labeled 95x95.gif
Latest / Template: 44 / Best Exotic Free Energy Technolgies For Sale: Directory:Buoyancy > Directory:Gaia-Energy -- Global Association for Independent Energy & Altruism > FOR SALE: GAIA's 5 kW AuKW Home Power Generator - 5 kW continuous output (has load-following capability as well) 3-phase, 400 V-AC, 50 Hz. Tube: 4.4 meters high base: 0.5 x 0.5 m. Cost: around ~€ 13,500 Euro (see sales sheet for present price), plus VAT in Europe, plus shipping includes workshop fee for assembly of kit. 12-18 weeks fulfillment time. (PES Store)

-- SilverThunder 18:41, 3 August 2015 (UTC)

GAIA plans continuous delivery of 5 kW power plants
Image:Charging-my-phone-with RoschKPP sq 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Directory:Gaia-Energy -- Global Association for Independent Energy & Altruism > GAIA plans continuous delivery of 5 kW power plants - A local licensee from Rosch will provide the key components (generator, air compressor, and control circuit) and GAIA will source local manufacturers for the rest of the components that make the 5 kW home power system. Pushing through several delays, GAIA expects first deliveries within 8 weeks. (PESN July 21, 2015)
NEXT: Rosch's 15 kW and 100 kW Demo
Image:Sterling-Detlef-Stuart June20 2015 Rosch-Demo 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Blog:Rosch's 15 kW and 100 kW Demo > Why I'm 100% sure Rosch's KPP free energy technology works - We ruled out the water tower as having an energy source due to some hidden wire in the air hose. We ruled out the generator and table as having some kind of hidden wire going to it. Conventional wireless transmission is ruled out as well. That leaves one conclusion: self-sustaining with ~15 kW output as claimed. (PESN June 20, 2015)
Image:Rosch 15kW-and-100kW labeled simple sq 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Blog:Rosch's 15 kW and 100 kW Demo - A blog to track progress surrounding the June ~16 demo of two free energy Kinetic Power Plant demo systems near Cologne, Germany and the tour of the 1&5 MW plant construction sites in Croatia and Slovenia, respectively. (PESWiki May 29, 2015)
Image:Measurement-collage sq 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Blog:Rosch's 15 kW and 100 kW Demo > Event:2015:June: Rosch 15 kW and 100 kW Demo Measurement - We welcome your input to help make sure we can do a professional job of validating this exotic free energy technology. This page will be evolving as we get closer to the event. (PESWiki May 29, 2015)
Image:Ronny Plexiglas IMAG1953 sq 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Directory:Ronny Korsberg > Blog:Rosch's 15 kW and 100 kW Demo - A blog to track progress surrounding the June 19 demo of two free energy Kinetic Power Plant demo systems near Cologne, Germany and possible tour of the 1&5 MW plant construction sites in Croatia and Slovenia, respectively. (PESWiki June 2, 2015)

-- SilverThunder 05:10, 29 May 2015 (UTC)

updated SilverThunder 04:44, 3 June 2015 (UTC)

FYI: Archived Measurement Day+ Content

2015 Archive:Blog:GAIA's AuKW Demo: May 6(+) Measurement Day

-- SilverThunder

Mainstream Coverage: Falls Church Press, Virginia, USA

Google News alerts brought this to my attention:

Energy from Buoyancy – A New Disruptive Technology? - The people developing this technology, however, say that its basis “is the use of the laws of buoyancy in conjunction with a special generator. This is not a perpetual motion machine, but simply the use of energy differences between two systems.” (Falls Church News Press MAY 22, 2015)

It opens:

: MAY 22, 2015 10:16 AM

: By Tom Whipple

: In the past year yet another technology that seems to produce cheap, pollution-free energy has emerged. If this technology proves viable, it could join with cold fusion and hydrinos as an alternative to the combustion of fossil fuels. For several years now, I have been reporting on the progress in the development of cold fusion, or if you prefer Low Energy Nuclear Reactions, and a second technology developed by Blacklight Power, which is a method of compressing hydrogen atoms while releasing large amounts of energy. I realize that many of you have trouble accepting the validity of these technologies as they appear on the surface to be in violation of some key principles of currently accepted science however, progress in these technologies keeps being made and so far there is no definitive evidence that they are not valid.

I posted a comment in the article correcting a few things:

: The parent company with the IP and rights is Rosch, not GAIA. You have that backwards. GAIA Energy has licensed the 5 kW home power version for rollout world wide.

: Rosch is focused on utility scale roll-out, with a minimum plant size of 1 MW.

: The 15 kW system is one that was out in the field for 6 months running continuously, and is now being reassembled and refurbished there at their (near Cologne, Germany) facility for demonstration purposes.

: Detlef Dohmen, the Chairman of Rosch, told me last month that they have ~100 MW total presently in operation at various places.

-- SilverThunder 14:40, 23 May 2015 (UTC)

TWIFE™ Featuring Rosch Kinetic Generator
Image:150521 twife Sterling Rosch 95x95.gif
Latest: There was an error working with the wiki: Code[1] > Blog:GAIA's AuKW Demo > TWIFE™ Featuring Rosch Kinetic Generator - Also covering: LENR-to-Market Digest • Yildiz preparing for magnet motor sales launch • Steorn's Orbo 'Power Cube' • Self-Sustaining Motorbike by Victor Garcia • Hail Cannon Vortex Cloud Buster Using HHO Gas • The Book of GEET coming • Keppe Motor Kit 4.1 3D-Printed (FreeEnergyNews May 21, 2015)

-- SilverThunder 19:18, 22 May 2015 (UTC)

Vladi S. Travkin on how Rosch' Kinetic Power Plant (KPP) works
Image:VSTravkin-math-snapshot-on-Rosch 95x95.gif
Latest: Directory:Buoyancy > Directory:Thrust Kinetic Generator by Rosch Innovations AG > Vladi S. Travkin on how Rosch' Kinetic Power Plant works (link fixed) - The reason scientists can't wrap their heads around how Rosch' KPP could possibly work is that they are basing their logic on Conventional Orthodox Homogeneous Physics (COHP). "In reality, this is the multiphase (polyphase) -- actually 3-phase fluids flow dynamics regime" in play. (PESN May 19, 2015)

-- SilverThunder 22:12, 19 May 2015 (UTC)

Stuart and I are invited to 15 kW, 100 kW demo and 1 MW & 5 MW plant construction sites
Image:570kW-generator rd.jpg

Of course I replied "YES!!"

(Slightly edited)

: From: Detlef Dohmen

: To: Sterling Allan

: Sent: Tuesday, May 19, 2015 7:55 AM

: Hi [Sterling] Allan,

: Yesterday you ask me what kind of Gen. you could see in the background. That is a 530 KW, 375 RPM, PMG. This is for one stroke of our bigger plants.

: Next week we have the 15 KW running. TÜV will be in the house from Monday (this is not a GAIA topic). The order to the TÜV is proof of technology. I will ask him for a public version, which you could publish if you like.

: From the first week of June, the 100 KW show plant will run too.

: We wanna invite you and Stuart from a date after the June 14, to visit us in Germany and to make measurements and inspections like you want. (Your tickets and Hotel up to one week, on our expense).

: If you have some more time, we could visit our showplants in Koper (Slowenia 5 MW under construction) and Slovanski Brod (Croatia 1 MW under construction) as well.

: ...

: Kind regards

: Detlef

: --

: Save the Planet AG

: Detlef Dohmen CEO

: http://www.Rosch.AG

-- SilverThunder 18:14, 19 May 2015 (UTC)

Curtain Fall on Dis-assembly Day - YouTube Video

There was an error working with the wiki: Code[6]

Posted by Stuart Campbell

Tue 19 May 2015 at 3.30pm New Zealand Time

The video can be downloaded in Full Hi Def - 1,280 x 720. But note it is 3.5Gb in size.

https://www.youtube.com/watch?v=Ry2BIvaVseQ

This shot taken a few moments prior to (final moment actually 3.08.18 into the video) on the 13th May, 2015, the Security Guard (name unknown) had the honour of pushing the big red button to stop AuKW from operating at 3.21pm Cologne Time. It was straight after this the dismantling began.

AuKW was running 3 hours non-stop prior to the dis-assembly.

For viewer safety we guarantee the audio on this video to be skeptic free.

-- DJSTU 03:38, 19 May 2015 (UTC)

AukW 5kW Unit Being Offered with New Houses

Posted by Stuart Campbell

Tue 19 May 2015 at 11.49am New Zealand Time

There was an error working with the wiki: Code[7]

: http://www.isd.immobilien/gravitationskraftwerk-fakten

A German house building firm is offering an installation of a Gaia AuKW 5kW unit as part of building a brand new house.

Here's what they say, translated :

Data and facts about the gravitational power plant / lift power plant Power:

:Net Power: 4.8 kilowatts

:Voltage: 230 VAC, single phase

:Daily output: about 100 kWh

:Possible amount of energy per year: 40,000 kWh

Footprint:

:Base for the power plant: ca. 0,5 - 1,0 m2

:Height: approximately 5.0 m

:Mounting surface for accessories, measuring and control devices

Audible noise:

The volume during the operation of the lift power plant (AuKW) limited to moving parts of the system and the compressor. This works depending on speaker placement and sound insulation barely audible from the outside.

Functionality:

A special high-performance membrane compressor pumps air into the buoyancy tank, by the natural buoyancy and by the recoil generated when blowing out the water, the air-filled containers are continuously pushed upwards.

At the upper turning point the container turn the chain and the air can escape, the chambers are filled with water.

Ascending swirling air bubbles rely reduce the density of water. Here, the effect is utilized that a body in a fluid, which has more than eight percent of gas content, has no lift and quickly falls down.

The thus produced continuous mechanical motion drives, via a shaft and a gearbox to a generator, and this generates electricity. Many times more than is required for the operation of the compressor.

The movement of the buoyancy tank is forwarded via a gearbox to a generator that produces electricity therefrom. A very slow speed, patented Special Generator is tailored precisely to this constant revolutions and produces in total more electricity than is needed to maintain the movement (for the compressor).

Here used components are partially protected by patents.

During operation, the system automatically controls up to a certain point up and down, depending on the required amount of current.

Maintenance and Warranty:

:An intelligent control system takes over the monitoring of the system.

:We recommend an occasional visual inspection of the moving parts.

:By proper filling the system should operate in the winter without problems.

:Generators, compressors and pumps are certified, some proprietary components and are produced by reliable, well-known industrial suppliers.

:The entire system is delivered under EU law with 2 years warranty.

:A maintenance contract includes, among others an annual inspection and maintenance of the plant.

Construction:

:Fully or partially submerged in the ground or basement.

:Free-standing or on an existing wall outside or inside.

:Through the use of a suitable anti-freeze frost protection is given to about -30 ° C.

Our services for you:

:Supply and installation of the lift power plant (AuKW) with all required / ordered accessories and additional equipment.

:Making your calculations for a u.U. needed basis, incl. static and drawings.

:Transport and transport insurance

:Electrical engineering installation, connection to the house mains supply.

:Wall breakthroughs, cable laying

:Approval procedures

:Commissioning of the power plant.

:Briefing and explanations.

Depending on the application, installation method, local conditions, etc. even individual investments for brackets, accessories, batteries, storage options, connection to existing power generation systems, structural measures, foundations etc. can be necessary.

Please inform yourself beforehand about any required accessories and the structural requirements. We advise you to be happy and provide you with a holistic approach with cost estimate.

An ISD house with special request "power plant" includes a full-featured system for generating their own energy incl. All necessary control, storage and control devices.

Benefits:

:The external power supplies / power requirements reduced to a minimum or, ideally to zero!

:Use your own power plant for heating, cooling, water heating and for the required electricity in your house or your apartment.

:Never again an electricity bill!

:Never again a gas or oil bill or for other fuels!

:Generate your own electricity.

:Charge the batteries overnight your electric cars and save on your monthly fuel bills.

:Save fossil fuels and other resources, protect the environment.

:No CO2 emissions, no climate-damaging exhaust fumes etc.

:Safeguard your children and future generations a clean and affordable energy.

Costs:

:A gravitational power plant including planning, delivery, accessories, assembly, commissioning and training costs, depending on equipment from 25.000, - Euro net (preliminary calculation, plus VAT.)

:Create Structural requirements: according to individual costs and offer to visit the local conditions

:Individual equipment / accessories (power storage, etc.): as desired and needs, cost to get you to visit and planning

Edition / numbers:

The 5kW model will be built in a limited edition of only 500 pieces. Then it's over!

Operating costs:

According to previous estimates, the monthly operating costs are around 15,00 Euro. Once a year, are mechanical components to check, exchange policy.

Amortization:

Depending on system size and type of use, a AuKW amortized at different rates. In the best cases as early as the second year of operation. For more information on amortization of AuKW can be found here.

Absolutely independent from the sun, wind, hydropower and tides without biomass, without gas, coal or nuclear. Temperature-independent and location independent, the lift power plant (AuKW) generates electricity day and night, around the clock, 365 days a year, by gravitational force. At virtually any location such gravitational power plant can be realized, with some more or less complex ancillary works to create the structural conditions (foundation, housing, etc.).

For a private use, you could save the electric service connection ideally. It depends, however, on the nature of the proposed use. At certain times of day and especially in the summer months, for example, more electrical power is available when needed. This could then be fed with a house connection to the public power grid. Even when an unforeseen emergency or at the annual short maintenance required energy could then be related interruption in the household connection from the public network.

[[Image:Builders_and_Christoph_19May%2C2015.jpg|thumb|500px|Photo: Michael Dischereit (sparWÄRME.de), Christoph Beiser (club GAIA)

Heiko Erxleben (ISD construction)]]

In conjunction with our high-performance energy storage / battery, you can be energy self-sufficient with the appropriate usage, store the electricity generated for free and consume itself. You make yourself independent from the public grid, regardless of fluctuating and rising energy prices.

Charge your electric car with its own free electricity savings therefore still expensive fuel costs. Free electric mobility. Power is the future, free electricity means financial independence.

Let us advise you which option is most suitable for you. A buoyant power plant can supply all types of buildings with energy, regardless of whether a single-family, semi-detached, townhouse or apartment house. Residential buildings or business activities.

Whether new construction or renovation - we find a solution for your energy problem. Replace your old heater to a new boost power plant (AuKW) with infrared heating. With our solutions, you can of course use your radiators or underfloor heating even further, you help your gas or oil heating with a free energy of a buoyant power plant (AuKW).

-- DJSTU 23:49, 18 May 2015 (UTC)

Official: Gaia - Next Steps After Disassembly

Posted by Stuart Campbell

Tue 19 May 2015 at 11.00am New Zealand Time

There was an error working with the wiki: Code[8]

May 18, 2015

Latest Update Post from Christoph Beiser at Gaia (Translated)

Project AuKW - Summary and Next Steps

Transparency down to the smallest angle ... Plus 5 comments

By Christoph Beiser

: http://gaia-energy.org/projekt-aukw-resumee-und-naechste-schritte/

Publicly our 1st GAIA sample has been turned off successfully, dismantled and taken apart on May 13, 2015.

As expected, no hidden batteries, motors or signs of cable passages in the ground or walls are revealed getreteten.

This confirms what many people already know - the AuKW works. Now it is only up to us whether we continue to pay attention to specific lies spread and the resulting induced doubts or helping this technology to finally breakthrough!

How often do we say, "How nice it would be if ...?" Even if it is hard to believe: If it is now!

Honestly - I personally am proud to be a power plant from the first series (with a serial number between 1 and 500) to possess and thus to be among the pioneers which are largely responsible for this bahnbechenden technology a new era einzuläuten.Ich am pleased about everyone who treads this path with us.

Therefore take this chance and be actively involved. Now The perfect choice for power plant, because we can only really get going if we have together the 500 pieces.

And so it goes

Fulfill your order - Step 1

Once we have the full 500 pcs, we will build the first seminar pattern and thereby create the operating and assembly instructions.

Step 2 - Trainer education

This will be shown separately and advertised as newsletter here online. Applications we ask then as a response to this tender.

Step 3 - Preparation of the Workshops

It is important for us, as close as possible in your region to hold a workshop. Once we know where all orders come, we can set and announced the Workshop regions. Here, too, follows a separate newsletter and post online. Power plant owners who can offer a suitable place for the organization of the workshop, please, to apply for the e-mail address aukw-aufbau@gaia-energy.org. We need a hall with at least 6 meters in height and about 100 m2 of free space, an overhead crane, forklift, staff rooms and toilets for about a week for the workshops.

Step 4 - Implementation of workshops

The aim is mid / late July to begin the first workshop and erected the completed kits to the end of August, assembled and to have checked. Only after successful Funktionsprüfiung of each individual power plant, the workshop has been completed and the final power plant will be delivered by a forwarding to the final destination. There can be connected by a qualified electrician.

In case of failure of the power plant of the trainer of the workshop will be the first point of contact for assistance are available.

Step 5 - Enjoy

Enjoy many curious glances and live in the awareness of being one of the pioneers who have actively helped this technology breakthrough.

-- DJSTU 23:07, 18 May 2015 (UTC)

Continuation

: http://www.gaia-energy.org - Official blog

Archives

2015 Archive:Blog:GAIA's AuKW Demo: May 13 Disassembly Day

2015 Archive:Blog:GAIA's AuKW Demo: May 13 Disassembly Day

2015 Archive:Blog:GAIA's_AuKW_Demo: May 6(+) Measurement Day

2015 Archive:Blog:GAIA's AuKW Demo: May 6(+) Measurement Day

2015 Archive:Blog:GAIA's_AuKW_Demo: May 1-5, Surpassed 1 MW-h

2015 Archive:Blog:GAIA's AuKW Demo: May 1-5, Surpassed 1 MW-h

2015 Archive:Blog:GAIA's_AuKW_Demo: April 25-30, Including Coverage on Outage

2015 Archive:Blog:GAIA's AuKW Demo: April 25-30, Including Coverage on Outage

2015 Archive:Blog:GAIA's_AuKW_Demo: Prior to April 25 Demo Launch

2015 Archive:Blog:GAIA's AuKW Demo: Prior to April 25 Demo Launch

See also

ROSCH FOOTER

Directory:Thrust Kinetic Generator by Rosch Innovations AG - focusing on utility-scale

Blog:Rosch's 15 kW and 100 kW Demo

Event:2015:June: Rosch 15 kW and 100 kW Demo Measurement

Directory:Gaia-Energy -- Global Association for Independent Energy & Altruism - licensee to produce 5 kW home power system

Blog:GAIA's AuKW Demo - 5 kW production prototype demonstrated running continuously from April 25 - May 6, 2015

2015 Archive:Blog:GAIA's AuKW Demo: May 13 Disassembly Day

2015 Archive:Blog:GAIA's AuKW Demo: May 6(+) Measurement Day

2015 Archive:Blog:GAIA's AuKW Demo: May 1-5, Surpassed 1 MW-h

2015 Archive:Blog:GAIA's AuKW Demo: April 25-30, Including Coverage on Outage

2015 Archive:Blog:GAIA's AuKW Demo: Prior to April 25 Demo Launch

There was an error working with the wiki: Code[1]

ACTIVE BLOGS

Blog:Index - free energy blog

Blog: U-Plug Third Party Test March 26, 2016

PAST BLOGS

Blog:GAIA's AuKW Demo

BLOG FOOTER

News - daily, from around the world

http://PESN.com - Feature stories by Template: 49

Latest - Leaves some of the lesser stories out

This Week in Free Energy™ - weekly recap

http://FreeEnergyQuest.com

NEWS BY TOPIC -->

Template: 48

News:Archive

News:Appropriate Slogans for Mainstream News

- Main Page

There was an error working with the wiki: Code[1]

There was an error working with the wiki: Code[2]

There was an error working with the wiki: Code[3]

Comments